Premium product planned the way it always should have been.
How a luxury menswear house planned long-lead-time, premium product with confidence — cutting airfreight and freeing working capital.
Working capital freed
Forecast accuracy
Airfreight spend
Stock holdings
The challenge
Premium, long-lead-time product left little room for error. Misses were covered with expensive airfreight, and working capital sat tied up in slow-moving stock.
What changed
The forecast, the planning and the supplier tools worked as one — the buy planned to real lead times, so fewer rush shipments were needed and the stock matched the demand.
The result
Airfreight spend down 21%, forecast accuracy up 15 points, holdings reduced, and close to a million in working capital freed.
“The automation, the forecasting and the supplier tools together make it an absolute no-brainer. We can plan cashmere the way we always wanted to and nobody on the team wants the old way back.”
Plan with confidence. One set of numbers, every team, every week.
There's nothing to rip out. Tightly runs on your existing ERP, EDI, e-commerce and POS. Give us 30 minutes and we'll show it on your own categories.